Safety Operation Specifications for Water Well Drilling RIGS in Coal Seams
In the complex coal seam operation environment, formulating strict safety operation specifications is crucial.water well drilling rig
- Conduct safety training for operators before construction, making them familiar with coal seam geological features, rig operation procedures, and emergency handling methods.
- During operation, strictly implement the “three inspections before blasting” system (check gas concentration before charging, 爆破, and after blasting) to strengthen gas monitoring.
- Regularly inspect the safety performance of rig equipment to ensure the normal operation of braking, hydraulic, electrical, and other systems.
- Set up safety facilities such as protective railings and fall arrestors at the wellhead to prevent personnel and equipment from falling.water well drilling rig
- 同时, formulate a complete emergency plan, equip emergency rescue equipment and materials, and carry out regular emergency drills to safeguard the lives of construction personnel.