Key points for equipment maintenance and upkeep of water well drilling RIGS in soft soil layers after construction

After construction in soft soil layers, comprehensive maintenance of water well drilling rig equipment can extend its service life and prepare for next use. Here are key steps:

 

  1. Thoroughly Clean the Equipment:
    • Remove soil, mud, and impurities from both the surface and interior.
    • This prevents debris from causing long-term wear and corrosion.
  2. Inspect and Replace Worn Components:
    • Check all parts for wear and replace severely damaged ones promptly.
    • Focus on transmission systems, hydraulic components, and seals prone to soft soil damage.
  3. Service Mechanical and Electrical Systems:
    • Replace lubricating oil and hydraulic fluid in transmission/hydraulic systems.
    • Adjust component clearances and tighten electrical connections to ensure no leakage.
  4. Proper Storage and Protection:
    • Store equipment in dry, ventilated areas to avoid moisture damage.
    • Apply anti-rust oil to susceptible parts (例如, drill pipes, chassis) for corrosion protection.water well drilling rig