Down-the-hole drilling rig for the foundation construction of photovoltaic power stations

In photovoltaic (PV) power station foundation construction, large-scale projects require efficient drilling equipment to boost efficiency. Down-the-hole (DTH) drills play a vital role here. PV power station foundations often use cast-in-place or precast piles, needing extensive drilling operations.down the hole drilling rig

 

DTH drills can quickly create qualified foundation holes based on the terrain and geology of PV power stations. They drill 100-150mm diameter and 2-5m deep foundation holes for installing PV support foundations.

Moreover:

 

  1. Their high drilling speed and stable performance accelerate PV power station construction.
  2. The efficient operations help reduce construction costs for large-scale PV projects.
  3. Adaptability to different site conditions ensures consistent drilling quality for foundation installation.down the hole drilling rig