Hole shrinkage in expansive soils often appears “necked,” with three-level prevention and control
measures:water well drilling rig
-
Prevention stage:
Maintain mud density at 1.15–1.20 during drilling to form a dense mud cake.
-
Monitoring stage:
Use a caliper to measure in real time; activate emergency response when shrinkage rate exceeds 5%.
-
Treatment stage:
Employ a reaming bit (20mm larger than design diameter) with chemical consolidants.water well drilling rig
