Maintenance Regulations for Frozen Soil Water Well Drilling Rig 2025-06-27 Lajme 29 Pamje Water well drilling rig special maintenance focuses on five major components: Hydraulic system:Replace return oil filter every 50 hours to prevent ice chip blockage. Power system:Check antifreeze freezing point daily (must be 10°C lower than ambient temperature). Drilling tool system:Apply antifreeze lubricating grease (drop point ≥150°C) after use. Electrical system:Test cable insulation resistance weekly (must be >10MΩ). Cooling system:Let the engine idle for 10 minutes before shutdown to prevent thermal stress cracking. Drills at Antarctica’s Kunlun Station have operated for 3 consecutive years without major failures following these regulations.water well drilling rig Etiketa:pajisje për shpimin e pusit të ujit Pjesë: FacebookTwitterLinkedInWhatsapp I parakohshëm: Casing Running Technology Breakthroughs in Frozen Soil Drilling-Water Well Drilling Rig Tjetër: Emergency Treatment Technologies for Water Inrush in Frozen Soil Drilling Related Masat paraprake për përdorimin e pajisjeve të shpimit të ujit Self-Service Water Well Drilling Equipment for Residential & Commercial Use How can the drilling industry make money Shandong Bangxin All-Hydraulic Portable Core Drill: The Ultimate Solution for Complex Terrain Exploration Oil Drilling Rig Safety Operation Guide: Key Technical Points for Professional Drilling How Long Does Core Drilling Take? 3 Key Factors That Determine the Timeline Safety Operation Guide for Water Well Drills: Five Golden Rules from Transportation to Maintenance Shandong Bangxin Machinery Equipment Co., Ltd. – Your Trusted Expert in Professional Machinery Manufacturing Përmbledhje e pajisjes së shpimit të ujit të ujit të Shandong Bangxin i krijuar për formacione me kalldrëm Mantel i shpimit të bangxinit të Kinës – Manuali i mirëmbajtjes super praktikë të shpimit të ujit