How to use a water well drilling rig to achieve the highest efficiency?
Water well drilling rigs are vital in water conservancy projects and geological exploration. Their efficiency directly impacts project progress and costs. Here are some ways to use them most effectively:
-
Thorough Pre – operation Preparation
- Check the rig completely. Ensure power, hydraulic systems, drill rods, and bits are in good condition to avoid work interruptions.
- Select bits and rod lengths based on geology. Use alloy bits for rock layers and spiral bits for soil layers to reduce resistance and speed up drilling.
-
Standardized Operation
- Operators should follow the manual strictly. Control drilling speed and pressure properly.
- Drill at a uniform speed for vertical and stable holes, preventing jamming and deviation.
- Utilize auxiliary functions like auto – feed and hydraulic lifts to save labor and speed up work. Keep drill rods and bits clean by removing cuttings to reduce wear.
-
Teamwork and Personnel Management
- Define clear roles for drillers, assistants, and technicians. Communicate well to solve problems quickly.
- Provide regular training so operators know the rig’s features and latest techniques, improving their skills.
With good preparation, standard operation, and efficient management, water well drilling rigs can work at their best for fast and stable drilling.