Repair and maintenance of water well drilling RIGS after coal seam mining

After coal seam mining operations, Буровая установка для бурения скважин на воду components wear and damage due to long-term complex geology.

 

  1. Thoroughly clean the rig to remove surface coal dust, mud, and other impurities.
  2. Inspect drilling tools for wear: replace or repair severely worn bits and drill pipes.
  3. Test hydraulic system sealing performance: replace aging seals and replenish/replace hydraulic oil.
  4. Conduct insulation testing and circuit maintenance on the electrical system to ensure safe operation.water well drilling rig
  5. Through regular repair and maintenance, extend the rig’s service life and prepare for subsequent operations.