Перед использованием буровой установки для бурения скважин на воду, Оператор должен внимательно ознакомиться с “Инструкция по эксплуатации буровых установок для бурения скважин на воду” для ознакомления с такими вопросами, как производительность, структура, technical operation, and maintenance.
Drilling rig operators must undergo professional training before they are permitted to operate.

The operator’s personal clothing should fit well and be tightened to prevent it from getting caught in the moving parts of the drilling rig and causing harm to the limbs.
The relief valves and functional valve groups in the hydraulic system have been adjusted to the appropriate positions at the factory. Do not adjust them arbitrarily. If adjustment is really necessary, it must be carried out by professional technicians or technicians who have received professional training, strictly in accordance with the requirements of the instruction manual, to adjust the working pressure of the water well drilling rig.
Pay attention to the working environment around the drilling rig to prevent subsidence and collapse.
Before starting the water well drilling rig, ensure that all parts of the rig are in good condition and free from damage.
When the water well drilling rig is working, it should operate within the specified speed range. Over – loading operation is strictly prohibited.
During the drilling process of the water well drilling rig, when the drill pipes are connected by threads, reverse rotation of the power head is strictly prohibited to prevent thread loosening. Only when adding or disassembling drill pipes and the gripper firmly clamps the drill pipe can reverse rotation be carried out.
During the drilling process of the water well drilling rig, when adding drill pipes, ensure that the threads at the drill pipe connections are tightened to prevent thread loosening and accidents such as the slipping of the drill bit and gripper.
During the drilling process of the water well drilling rig, no one is allowed to stand in front of the drilling rig. The operator should stand on the side, and unauthorized personnel are prohibited from observing at close range to prevent flying stones from causing injuries.
When the water well drilling rig is in operation, the operator should be extra careful and pay attention to safety when approaching the exposed parts of the drilling rig.
When replacing hydraulic components, ensure that the hydraulic oil passages are clean and free of debris, and the replacement should be carried out under no – pressure conditions. The hydraulic components should have safety labels and be within the validity period.
The electromagnetic hydraulic system is a precision component. Do not disassemble it privately to ensure the cleanliness of the oil passages.
When connecting high – pressure air pipes, there should be no debris at the joints and inside the air pipes to prevent damage to the solenoid valve spool.
When the oil level in the atomizer drops, it should be replenished in time. Operation under oil – shortage conditions is strictly prohibited.
The four directional wheels of the lifting chain must be kept clean. The chain should be filled with lubricating oil, not grease.
The motor gearbox should be maintained before each operation of the water well drilling rig.
If there is a hydraulic oil leak, stop working and resume work after maintenance.
When the rig is not in use, cut off the power supply in time.