Maintenance Regulations for Frozen Soil Water Well Drilling Rig 2025-06-27 Новости 245 Views Water well drilling rig special maintenance focuses on five major components: Hydraulic system:Replace return oil filter every 50 hours to prevent ice chip blockage. Power system:Check antifreeze freezing point daily (must be 10°C lower than ambient temperature). Drilling tool system:Apply antifreeze lubricating grease (drop point ≥150°C) after use. Electrical system:Test cable insulation resistance weekly (must be >10MΩ). Cooling system:Let the engine idle for 10 minutes before shutdown to prevent thermal stress cracking. Drills at Antarctica’s Kunlun Station have operated for 3 consecutive years without major failures following these regulations.water well drilling rig Теги:Буровая установка для бурения скважин на воду Предоставить общий доступ: ФейсбукЩебетатьLinkedInВатсап Предыдущая: Intelligent Upgrading Path for Frozen Soil Water Well Drilling Rig Следующий: Casing Running Technology Breakthroughs in Frozen Soil Drilling-Water Well Drilling Rig Related Меры предосторожности при использовании буровых установок для бурения скважин на воду Self-Service Water Well Drilling Equipment for Residential & Commercial Use How can the drilling industry make money Shandong Bangxin All-Hydraulic Portable Core Drill: The Ultimate Solution for Complex Terrain Exploration Oil Drilling Rig Safety Operation Guide: Key Technical Points for Professional Drilling How Long Does Core Drilling Take? 3 Key Factors That Determine the Timeline Safety Operation Guide for Water Well Drills: Five Golden Rules from Transportation to Maintenance Shandong Bangxin Machinery Equipment Co., Ltd. – Your Trusted Expert in Professional Machinery Manufacturing Overview of Shandong Bangxin’s Water Well Drilling Rig Designed for Cobble Formations China Bangxin Drilling Rig – Water Well Drilling Rig Super Practical Maintenance Manual