The water well drilling rig DTH
hammer eases operations, lowering labor needs.
-
Simplified operation: One person can start/stop the rig and adjust parameters. Cuts 1-2 auxiliary workers vs. traditional rigs.
-
Lower labor costs: A rural team saw 40% reduction per well. Controls let less skilled workers ensure quality.
-
Easy setup: 2-3 people handle transport and installation. A poverty alleviation project finished 20 days early.
Its integration and automation drive these gains. The water well drilling rig saves much on labor.
