Risk Assessment and Countermeasures for Water Well Drilling in Red Clay Areas

Water well drilling rig works in red clay regions involves multiple risks requiring comprehensive assessment and solutions:

1. Geological Risks

  • Swelling-shrinking, thickness variation, and fissures in red clay may cause borehole collapse or drill tilting.
  • Pre-drilling: Conduct geological surveys to understand red clay properties.
  • Measures: Adopt proper mud wall protection and reinforce drill supports to prevent tilting.

2. Equipment Risks

  • Red clay’s special properties accelerate wear on drill components, risking malfunctions.
  • Regular maintenance: Focus on inspecting wear parts (bits, drill pipes, mud pumps) and replace severely worn items.
  • Emergency preparedness: Equip drills with backup power systems for sudden failures.water well drilling rig.Bangxin water well drilling rig

3. Safety Risks

  • Complex working environments pose risks like falls and electric shocks.
  • Strengthen site safety management: Install warning signs, train workers, standardize operations, and provide safety gear.

 

Through risk assessment and targeted countermeasures, water well drilling risks in red clay areas can be mitigated to ensure smooth operations.