After construction in soft soil layers, comprehensive maintenance of water well drilling rig equipment can extend its service life and prepare for next use. Here are key steps:
-
Thoroughly Clean the Equipment:
- Remove soil, mud, and impurities from both the surface and interior.
- This prevents debris from causing long-term wear and corrosion.

-
Inspect and Replace Worn Components:
- Check all parts for wear and replace severely damaged ones promptly.
- Focus on transmission systems, hydraulic components, and seals prone to soft soil damage.
-
Service Mechanical and Electrical Systems:
- Replace lubricating oil and hydraulic fluid in transmission/hydraulic systems.
- Adjust component clearances and tighten electrical connections to ensure no leakage.
-
Proper Storage and Protection:
- Store equipment in dry, ventilated areas to avoid moisture damage.
- Apply anti-rust oil to susceptible parts (e.g., drill pipes, chassis) for corrosion protection.water well drilling rig