Maintenance Regulations for Expansive Soil Water Well Drilling Rig 2025-06-28 ニュース 32 Views Special maintenance focuses on five major systems:water well drilling rig Mud system:Flush pipelines daily with high-pressure water (≥10MPa) to prevent clay deposition. Power system:Check cooling system scale every 50 hours (thickness ≤0.5mm). Drill tool system:Apply anti-adhesion grease (drop point ≥120℃) after use. Electrical system:Test insulation resistance weekly (≥50MΩ) to prevent moisture short circuits. Hydraulic system:Replace anti-wear hydraulic oil every 100 hours (viscosity index VI≥140).water well drilling rig Tags:water well drilling rig 共有: フェイスブック囀るLinkedInのワッツアップ Prev: Intelligent Monitoring System for Expansive Soil Water Well Drilling Rig Next: Casing Anti-corrosion Technologies in Expansive Soil Water Well Drilling Related 井戸掘削リグの使用上の注意 住宅用セルフサービスの井戸掘削装置 & 商用利用 掘削業界はどのようにしてお金を稼ぐことができますか Shandong Bangxin All-Hydraulic Portable Core Drill: The Ultimate Solution for Complex Terrain Exploration Oil Drilling Rig Safety Operation Guide: Key Technical Points for Professional Drilling How Long Does Core Drilling Take? 3 Key Factors That Determine the Timeline Safety Operation Guide for Water Well Drills: Five Golden Rules from Transportation to Maintenance 山東Bangxin機械設備有限公司, 株式 会社. – Your Trusted Expert in Professional Machinery Manufacturing Overview of Shandong Bangxin’s Water Well Drilling Rig Designed for Cobble Formations China Bangxin Drilling Rig – Water Well Drilling Rig Super Practical Maintenance Manual