Aiming at the “
spatiotemporal variability”
of expansive soils,
adopt a “
three-stage construction method”:Plataforma de perforación de pozos de agua
-
Pretreatment stage:
Advance dewatering (lower groundwater level by 2–3m) to reduce soil water content.
-
Drilling stage:
Use parameter combination of “low rotation speed (100–150r/min) + high drilling pressure (8–10kN)”.
-
Well completion stage:
Conduct cement-sodium silicate double-fluid grouting immediately after casing running.water well drilling rig