Water inrush in frozen soil aquifers often occurs due to sudden
temperature rise. water well drilling rig.Emergency measures include:
-
Ice plugging:
Inject dry ice (-78°C) into the hole to form a 20cm-diameter ice plug.
-
Quick-setting grouting:
Use sulphoaluminate cement (initial setting in 15 minutes) with water glass.
-
Freezing water stop:
Arrange 4-6 freezing holes around the hole to form a 1.5m-thick curtain.

After application in Yushu frozen soil area, Qinghai, 3 water inrush accidents were successfully handled with an average treatment time of 48 hours.water well drilling rig